Red Pine Commences Focused Surface Drilling Program to Assess Potential for Near-Term, Open Pit Production

3 hours ago 1

Article content

Ongoing Drilling Program

Article content

Red Pine is currently drilling with 2 rigs and has completed approximately 65% of the fully funded 25,000 m exploration program. Approximately 8,000 – 9,000 metres of drilling is allocated to evaluate the near-term, open-pit potential and is expected to take 3 months to complete. The near-surface drilling program will consist of closely spaced drill holes aiming to increase confidence in the 2024 MRE and extend gold mineralization within the crown pillars of the former Surluga and Jubilee mines where historic drilling was limited. Additional drill testing of the deeper extension of the Jubilee Shear is planned to continue in parallel with the drill testing of the near-surface extension of the Jubilee Shear.

Article content

Qualified Person

Article content

Jean-Francois Montreuil, P.Geo. and Vice President, Exploration of Red Pine and the Qualified Person, as defined by National Instrument 43-101, has reviewed and approved the technical information contained in this news release.

Article content

About Red Pine Exploration Inc.

Article content

Red Pine Exploration Inc. is a gold exploration company headquartered in Toronto, Ontario, Canada. The Company’s shares trade on the TSX Venture Exchange under the symbol “RPX” and on the OTCQB Markets under the symbol “RDEXF”.

Article content

Article content

The Wawa Gold Project is in the Michipicoten Greenstone Belt of Ontario, a region that has seen major investment by several producers in the last five years. The Company’s land package hosts numerous historic gold mines and is over 7,000 hectares in size. Red Pine is building a strong position as a major mineral exploration and development player in the Michipicoten region.

Article content

For more information about the Company, visit www.redpineexp.com

Article content

Or contact:

Article content

Michael Michaud, President and Chief Executive Officer, at (416) 364-7024 or [email protected]
Or

Article content

Manish Grigo, Director of Corporate Development, at (416) 569-3292 or [email protected]

Article content

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Article content

Cautionary Note Regarding Forward-Looking Information

Article content

This news release contains statements which constitute “forward-looking information” within the meaning of applicable securities laws, including statements regarding the plans, intentions, beliefs and current expectations of the Company with respect to future business activities and operating performance.

Article content

Article content

Forward-looking information is often identified by the words “may”, “would”, “could”, “should”, “will”, “intend”, “plan”, “anticipate”, “believe”, “estimate”, “expect” or similar expressions. Forward-looking information contained in this news release includes, but may not be limited to, statements regarding the potential of developing an early stage open-pit operation, updating the 2024 MRE and completing a PEA in Q1 2026.. Investors are cautioned that forward-looking information is not based on historical facts but instead reflects management’s expectations, estimates or projections concerning future results or events based on the opinions, assumptions and estimates of management considered reasonable at the date the statements are made. Such opinions, assumptions and estimates are inherently subject to a variety of risks and uncertainties that could cause actual events or results to differ materially from those projected and undue reliance should not be placed on such information, as unknown or unpredictable factors could have material adverse effects on future results, performance or achievements. Among the key factors that could cause actual results to differ materially from those projected in the forward-looking information are: the Company’s expectations in connection with the projects and exploration programs being met, the impact of general business and economic conditions, global liquidity and credit availability on the timing of cash flows and the values of assets and liabilities based on projected future conditions, fluctuating gold prices, currency exchange rates (such as the Canadian dollar versus the United States Dollar), variations in ore grade or recovery rates, changes in accounting policies, changes in the Company’s mineral reserves and resources, changes in project parameters as plans continue to be refined, changes in project development, construction, production and commissioning time frames, the possibility of project cost overruns or unanticipated costs and expenses, higher prices for fuel, power, labour and other consumables contributing to higher costs and general risks of the mining industry, failure of plant, equipment or processes to operate as anticipated, unexpected changes in mine life, seasonality and weather, costs and timing of the development of new deposits, success of exploration activities, permitting time lines, government regulation of mining operations, environmental risks, unanticipated reclamation expenses, title disputes or claims, and limitations on insurance.

Read Entire Article