Lithium Ionic Files NI 43-101 Technical Report for the Bandeira Mineral Resource Estimate, Minas Gerais, Brazil

2 hours ago 1

Article content

TORONTO, June 09, 2025 (GLOBE NEWSWIRE) — Lithium Ionic Corp. (TSXV: LTH; OTCQX: LTHCF; FSE: H3N) (the “Company” or “Lithium Ionic”) reports that it has filed the independent NI 43-101 compliant technical report for its 100%-owned Bandeira Lithium Project (“Bandeira” or the “Project”) in Minas Gerais State, Brazil, related to the updated Mineral Resource Estimate (“MRE”) for the Project announced on May 6, 2025.

Financial Post

THIS CONTENT IS RESERVED FOR SUBSCRIBERS ONLY

Subscribe now to read the latest news in your city and across Canada.

  • Exclusive articles from Barbara Shecter, Joe O'Connor, Gabriel Friedman, and others.
  • Daily content from Financial Times, the world's leading global business publication.
  • Unlimited online access to read articles from Financial Post, National Post and 15 news sites across Canada with one account.
  • National Post ePaper, an electronic replica of the print edition to view on any device, share and comment on.
  • Daily puzzles, including the New York Times Crossword.

SUBSCRIBE TO UNLOCK MORE ARTICLES

Subscribe now to read the latest news in your city and across Canada.

  • Exclusive articles from Barbara Shecter, Joe O'Connor, Gabriel Friedman and others.
  • Daily content from Financial Times, the world's leading global business publication.
  • Unlimited online access to read articles from Financial Post, National Post and 15 news sites across Canada with one account.
  • National Post ePaper, an electronic replica of the print edition to view on any device, share and comment on.
  • Daily puzzles, including the New York Times Crossword.

REGISTER / SIGN IN TO UNLOCK MORE ARTICLES

Create an account or sign in to continue with your reading experience.

  • Access articles from across Canada with one account.
  • Share your thoughts and join the conversation in the comments.
  • Enjoy additional articles per month.
  • Get email updates from your favourite authors.

THIS ARTICLE IS FREE TO READ REGISTER TO UNLOCK.

Create an account or sign in to continue with your reading experience.

  • Access articles from across Canada with one account
  • Share your thoughts and join the conversation in the comments
  • Enjoy additional articles per month
  • Get email updates from your favourite authors

Sign In or Create an Account

or

Article content

The technical report, titled Bandeira Lithium Project NI 43-101 Technical Report Mineral Resource Update, Aracuai-Itinga, Minas Gerais, Brazil was prepared by GE21 Consultoria Mineral Ltda. (“GE21”), AtkinsRéalis, L&M Advisory and Planminas in accordance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”) and has an effective date of November 20, 2024. The MRE was prepared by GE21.

Article content

Article content

Article content

The report details the MRE comprising Measured and Indicated resources of 27.27 million tonnes (“Mt”) grading 1.34% Li₂O (901,059 tonnes of lithium carbonate equivalent – “LCE”) and an additional 18.55Mt in the Inferred category grading 1.34% Li₂O (615,432t LCE). An updated Feasibility Study to integrate this expanded MRE is underway and expected in H2 2025.

Article content

By signing up you consent to receive the above newsletter from Postmedia Network Inc.

Article content

This updated Bandeira MRE increases the Company’s consolidated, global mineral resources to 36.76 Mt grading 1.31% Li₂O in the M&I category, in addition to 31.87 Mt grading 1.19% Li₂O in the Inferred category.

Article content

Bandeira covers 158 hectares, less than 1% of Lithium Ionic’s 17,000-hectare land position, but has rapidly advanced to become one of the most promising lithium development-stage assets in Brazil. It is located adjacent to Sigma Lithium’s Grota do Cirilo and Barreiro projects and directly beside Companhia Brasileira de Lítio’s (CBL) long-standing underground lithium operation.

Article content

The technical report is available on SEDAR+ (www.sedarplus.ca) under Lithium Ionic’s issuer profile and on the Company’s website at www.lithiumionic.com.

Article content

Article content

*See press release dated January 14, 2025, for details related to the Baixa Grande MRE (effective date of December 2, 2024; QP: Leonardo Soares, P.Geo., M.Sc., of GE21), and the NI 43-101 compliant technical reports related to the Outro Lado deposit titled “Mineral Resource Estimate for Lithium Ionic, Itinga Project” (effective date of June 24, 2023; authored by Maxime Dupéré, B. Sc., P.Geo. and Faisal Sayeed, B. Sc., P.Geo).

Article content

About Lithium Ionic Corp.

Article content

Lithium Ionic is a Canadian mining company exploring and developing its lithium properties in Brazil. Its Itinga and Salinas group of properties cover ~17,000 hectares in the northeastern part of Minas Gerais state, a mining-friendly jurisdiction that is quickly emerging as a world-class hard-rock lithium district. Its Feasibility-stage Bandeira Project is situated in the same region as CBL’s Cachoeira lithium mine, which has produced lithium for +30 years, as well as Sigma Lithium Corp.’s Grota do Cirilo project, which hosts the largest hard-rock lithium deposit in the Americas.

Article content

Qualified Persons

Article content

Carlos José Evangelista Silva, MSc Geo. (MAIG membership number 7868), of GE21 is a Qualified Person as defined by NI 43-101 and has reviewed and approved the technical information and data regarding the MRE included in this news release. Mr. Silva is independent of Lithium Ionic. All other scientific and technical information in this news release has been reviewed and approved by Carlos Costa, Vice President Exploration of Lithium Ionic and Blake Hylands, CEO and director of Lithium Ionic, and both are “qualified persons” as defined in NI 43-101.

Read Entire Article