Article content
VANCOUVER, British Columbia, July 15, 2026 (GLOBE NEWSWIRE) — Winshear Metals Corp. (TSX-V: WINS, FRA: 9HR0) reports that a downhole electromagnetic (‘DHEM’) survey completed after the recent drill program at the Portsoy Nickel – Copper – Cobalt (Ni-Cu-Co) Project in northeast Scotland, has identified a strong conductor, with characteristics of a massive sulphide body. The strong conductor is close to the 460m long drill hole RBD030 at the South Zone of the Rodburn Target (see Company news release dated May 26, 2026).
THIS CONTENT IS RESERVED FOR SUBSCRIBERS ONLY
Subscribe now to read the latest news in your city and across Canada.
- Exclusive articles from Barbara Shecter, Joe O'Connor, Gabriel Friedman, and others.
- Daily content from Financial Times, the world's leading global business publication.
- Unlimited online access to read articles from Financial Post, National Post and 15 news sites across Canada with one account.
- National Post ePaper, an electronic replica of the print edition to view on any device, share and comment on.
- Daily puzzles, including the New York Times Crossword.
SUBSCRIBE TO UNLOCK MORE ARTICLES
Subscribe now to read the latest news in your city and across Canada.
- Exclusive articles from Barbara Shecter, Joe O'Connor, Gabriel Friedman and others.
- Daily content from Financial Times, the world's leading global business publication.
- Unlimited online access to read articles from Financial Post, National Post and 15 news sites across Canada with one account.
- National Post ePaper, an electronic replica of the print edition to view on any device, share and comment on.
- Daily puzzles, including the New York Times Crossword.
REGISTER / SIGN IN TO UNLOCK MORE ARTICLES
Create an account or sign in to continue with your reading experience.
- Access articles from across Canada with one account.
- Share your thoughts and join the conversation in the comments.
- Enjoy additional articles per month.
- Get email updates from your favourite authors.
THIS ARTICLE IS FREE TO READ REGISTER TO UNLOCK.
Create an account or sign in to continue with your reading experience.
- Access articles from across Canada with one account
- Share your thoughts and join the conversation in the comments
- Enjoy additional articles per month
- Get email updates from your favourite authors
Sign In or Create an Account
or
Article content
Article content
The north-northwest plunging conductor is modelled as being over 350m long by 50m wide. It is above, and ~100m east of, the end of RBD030. The conductor remains open to depth (refer to Map 1 here).
Article content
Article content
By signing up you consent to receive the above newsletter from Postmedia Network Inc.
Article content
DHEM is an exploration tool used extensively in exploration for massive sulphide deposits.
Article content
The Company engaged Mr. Alan King of Geoscience North Ltd. of Sudbury, Ontario to model the DHEM data. Mr. King is widely known in the field of DHEM surveying, and previously held the roles of Chief Geophysicist of INCO (2000 – 2007) and Chief Geophysicist Global Exploration for Vale (2009 – 2013).
Article content
Previous drilling at the South Zone encountered strong Ni-Cu-Co massive sulphide mineralization extending from ~20m below surface to a vertical depth of approximately 185m below surface, with results including:
Article content
| Hole ID | From (m) | To (m) | Length (m) | True Thickness Estimated (m) | Ni % | Cu % | Co ppm | NiEq %* |
| RBD001 | 45 | 51 | 6 | 5.9 | 0.95 | 0.75 | 601 | 1.42 |
| RBD002 | 70 | 82 | 12 | 8.9 | 1.42 | 0.55 | 929 | 1.82 |
| RBD003 | 114 | 118 | 4 | 2.3 | 0.70 | 0.66 | 484 | 1.10 |
| RBD004 | 118.29 | 124.26 | 5.97 | 5.6 | 1.92 | 1.52 | 1198 | 2.86 |
| RBD009 | 60 | 65.39 | 5.39 | 5.3 | 2.04 | 0.56 | 1110 | 2.46 |
| RBD018 | 100 | 102 | 2 | 1.4 | 1.54 | 0.93 | 815 | 2.13 |
| Refer to the Company’s Technical Report here for all historic drill results. *NiEq (% nickel equivalent) based on US$19,000/t Ni, US$9,000/t Cu, US$32,000/t Co, using the formula Ni% + (0.524 x Cu%) + ((1.22 x 10-4) x Co ppm). Equal Recovery Assumed. | ||||||||
Article content
Article content
The Company plans to test this compelling target in the next round of drilling.
Article content
Qualified Person
Article content
J. Patricio Varas, P.Geo., a Qualified Person as defined by National Instrument 43-101 Standards of Disclosure for Mineral Projects, and also the Company’s President and Director, has read and approved all technical and scientific information contained in this news release.
Article content
About Winshear Metals Corp
Article content
Winshear Metals Corp. is a Canadian-based minerals exploration company with a nickel-copper-cobalt project in Scotland (the Portsoy Project) and gold / critical minerals project in Ontario (the Thunder Bay Project).
For more information, please contact Irene Dorsman at +1 (604) 200 7874 or visit www.winshear.com
Article content
ON BEHALF OF THE BOARD OF DIRECTORS
Article content
“Richard D. Williams”
Richard D. Williams, CEO
Article content
NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.
Article content
Caution Regarding Forward Looking Statements
Article content
Certain of the statements made and information contained in this press release may constitute forward-looking information and forward-looking statements (collectively, “forward-looking statements”) within the meaning of applicable securities laws, including statements regarding the downhole electromagnetic survey conducted at the Portsoy Project, the size, orientation, location and conductivity of the modelled conductor, the potential association of the conductor with massive sulphide mineralization, and the timing, scope, completion and results of the 2026 field program. The forward-looking statements in this press release reflect the current expectations, assumptions or beliefs of the Company based upon information currently available to the Company. With respect to forward-looking statements contained in this press release, assumptions have been made regarding, among other things, the reliability of information prepared and/or published by third parties that are referenced in this press release or was otherwise relied upon by the Company in preparing this press release. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and no assurance can be given that these expectations will prove to be correct as actual results or developments may differ materially from those projected in the forward-looking statements. Factors that could cause actual results to differ materially from those in forward-looking statements include but are not limited to: uncertainty in the interpretation and modelling of DHEM conductors; the possibility that conductors may not be associated with economic nickel, copper or cobalt mineralization; the risk that future drilling may not intersect massive sulphide mineralization or mineralization comparable to historical results; uncertainty regarding continuity, grade, true thickness and extent of mineralization; delays or challenges in planning, permitting, financing or completing exploration; access, weather, logistical, contractor and community-related risks in Scotland; changes in commodity prices, exchange rates, capital markets, laws or government policy; risks inherent in early-stage mineral exploration; and the other risks described in the Company’s public disclosure record. Readers are cautioned not to place undue reliance on forward-looking statements due to the inherent uncertainty thereof. Such statements relate to future events and expectations and, as such, involve known and unknown risks and uncertainties. The forward-looking statements contained in this press release are made as of the date of this press release and except as may otherwise be required pursuant to applicable laws, the Company does not assume any obligation to update or revise these forward-looking statements, whether as a result of new information, future events or otherwise.
Article content
Article content
Article content
Article content

Article content
Article content

1 hour ago
3
English (US)