Article content
Contact Lake Gold Project Overview:
Article content
The Contact Lake Gold Project covers approximately 22,790 hectares and includes the past-producing Contact Lake gold mine, which produced approx. 190,000 ounces of gold at an average head grade of 6.16 g/t Au during active mining operations between 1994 to 1998. At the time of mine closure, the price of gold hovered around $300/oz (USD) and Cameco Corporation reported that substantial gold resources were left unmined. Situated in the highly prospective La Ronge Gold Belt of Saskatchewan, the Contact Lake Property also hosts the Preview SW, Preview North and the North Lake orogenic gold deposits.
Article content
Along with the Greywacke North deposit (located by road 40km northeast of Contact Lake), these four deposits are wholly-owned by Trident Resources and host current Mineral Resource Estimates (Trident news release November 24, 2025) which do not include any gold-related ounces from the past-producing Contact Lake target area.
Article content
Quality Assurance and Quality Control:
Article content
All drill core is logged, photographed and cut in half with a diamond saw. Half of the core is placed in sealed poly bags with unique identification numbers and transported to ALS Global in Saskatoon, Saskatchewan for analysis, while the other half is archived and stored on site for verification and reference purposes.
Article content
Article content
At the lab, samples are received and digitally recorded then dried and pulverized into a fine powder. Gold is assayed using a 30g fire assay method and 49 additional elements are analyzed by Inductively Coupled Plasma (ICP) utilizing a 4-acid digestion. Secondary metallic screen analyses are performed on select mineralized zones and all samples that return >3 g/t Au to quantify the nugget effect of the gold mineralization. Quality Assurance and Quality Control (QAQC) samples including field blanks, duplicates and lab-certified standards are inserted in the sample stream at a rate of greater than 10% of all samples submitted to the lab. ALS Global also conducts their own internal QAQC protocol.
Article content
Qualified Person:
Article content
The technical information in this news release has been prepared in accordance with the Canadian regulatory requirements set out in National Instrument 43-101 and reviewed and approved by Cornell McDowell, P.Geo., VP Exploration for Trident Resources and the Qualified Person for Trident as defined by NI 43-101.
Article content
About Trident Resources Corp.
Article content
Trident Resources Corp. is a Canadian, public mineral exploration company listed on the TSX Venture Exchange focused on the acquisition and development of advanced-stage gold and copper exploration projects in Saskatchewan, Canada. The Company is aggressively advancing its 100% owned Contact Lake and Greywacke Lake projects which host significant gold resources located within the prospective and underexplored La Ronge Gold Belt, as well as the 100% owned Knife Lake copper project which contains a historical copper resource.
Article content
Article content
Article content
To find out more about Trident Resources Corp. (TSX-V: ROCK) visit the Company’s website at www.tridentresourcescorp.com.
Article content
TRIDENT RESOURCES CORP.
Article content
“Jon Wiesblatt”
Jonathan Wiesblatt
CEO and Director
Article content
For further information, please contact:
Article content
Jonathan Wiesblatt, Chief Executive Officer
Email: [email protected]
Article content
Or:
Article content
Andrew J. Ramcharan, PhD, P.Eng., SVP Corporate Communications
Email: [email protected]
Article content
Trident Resources Corp.
Telephone: 647-309-5130
Toll Free: 800-567-8181
Facsimile: 604-687-3119
Article content
NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THE CONTENT OF THIS NEWS RELEASE.
Article content
Forward-Looking Information
Article content
This news release contains “forward‐looking information or statements” within the meaning of applicable securities laws, which may include, without limitation, completing ongoing and planned work on its projects including drilling and the expected timing of such work programs, other statements relating to the technical, financial and business prospects of the Company, its projects and other matters. All statements in this news release, other than statements of historical facts, that address events or developments that the Company expects to occur, are forward-looking statements. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results may differ materially from those in the forward-looking statements. Such statements and information are based on numerous assumptions regarding present and future business strategies and the environment in which the Company will operate in the future, including the price of uranium, the ability to achieve its goals, that general business and economic conditions will not change in a material adverse manner, that financing will be available if and when needed and on reasonable terms. Such forward-looking information reflects the Company’s views with respect to future events and is subject to risks, uncertainties and assumptions, including the risks and uncertainties relating to the interpretation of exploration results, risks related to the inherent uncertainty of exploration and cost estimates and the potential for unexpected costs and expenses, and those filed under the Company’s profile on SEDAR+ at www.sedarplus.ca. Factors that could cause actual results to differ materially from those in forward looking statements include, but are not limited to, continued availability of capital and financing and general economic, market or business conditions, adverse weather or climate conditions, failure to obtain or maintain all necessary government permits, approvals and authorizations, failure to obtain or maintain community acceptance (including First Nations), decrease in the price of uranium and other metals, increase in costs, litigation, and failure of counterparties to perform their contractual obligations. The Company does not undertake to update forward‐looking statements or forward‐looking information, except as required by law.
Article content
Article content
Article content
Article content

Article content
Article content

1 hour ago
3
English (US)