Pulsar Helium Announces Completion of Jetstream #5 and Mobilization to Commence Jetstream #6 at the Topaz Helium Project, USA

2 hours ago 3

Article content

THIS ANNOUNCEMENT AND THE INFORMATION CONTAINED HEREIN IS RESTRICTED AND IS NOT FOR RELEASE, PUBLICATION OR DISTRIBUTION, IN WHOLE OR IN PART, DIRECTLY OR INDIRECTLY, IN, INTO OR FROM AUSTRALIA, JAPAN OR THE REPUBLIC OF SOUTH AFRICA OR TO BE TRANSMITTED, DISTRIBUTED TO, OR SENT BY, ANY NATIONAL OR RESIDENT OR CITIZEN OF ANY SUCH COUNTRIES OR ANY OTHER JURISDICTION IN WHICH SUCH RELEASE, PUBLICATION OR DISTRIBUTION MAY CONTRAVENE LOCAL SECURITIES LAWS OR REGULATIONS.

Financial Post

THIS CONTENT IS RESERVED FOR SUBSCRIBERS ONLY

Subscribe now to read the latest news in your city and across Canada.

  • Exclusive articles from Barbara Shecter, Joe O'Connor, Gabriel Friedman, and others.
  • Daily content from Financial Times, the world's leading global business publication.
  • Unlimited online access to read articles from Financial Post, National Post and 15 news sites across Canada with one account.
  • National Post ePaper, an electronic replica of the print edition to view on any device, share and comment on.
  • Daily puzzles, including the New York Times Crossword.

SUBSCRIBE TO UNLOCK MORE ARTICLES

Subscribe now to read the latest news in your city and across Canada.

  • Exclusive articles from Barbara Shecter, Joe O'Connor, Gabriel Friedman and others.
  • Daily content from Financial Times, the world's leading global business publication.
  • Unlimited online access to read articles from Financial Post, National Post and 15 news sites across Canada with one account.
  • National Post ePaper, an electronic replica of the print edition to view on any device, share and comment on.
  • Daily puzzles, including the New York Times Crossword.

REGISTER / SIGN IN TO UNLOCK MORE ARTICLES

Create an account or sign in to continue with your reading experience.

  • Access articles from across Canada with one account.
  • Share your thoughts and join the conversation in the comments.
  • Enjoy additional articles per month.
  • Get email updates from your favourite authors.

THIS ARTICLE IS FREE TO READ REGISTER TO UNLOCK.

Create an account or sign in to continue with your reading experience.

  • Access articles from across Canada with one account
  • Share your thoughts and join the conversation in the comments
  • Enjoy additional articles per month
  • Get email updates from your favourite authors

Sign In or Create an Account

or

Article content

THIS ANNOUNCEMENT CONTAINS INSIDE INFORMATION FOR THE PURPOSES OF ARTICLE 7 OF THE UK VERSION OF REGULATION (EU) NO. 596/2014 ON MARKET ABUSE, AS IT FORMS PART OF UK DOMESTIC LAW BY VIRTUE OF THE EUROPEAN UNION (WITHDRAWAL) ACT 2018, AND REGULATION (EU) NO. 596/2014 ON MARKET ABUSE.

Article content

Article content

Article content

UPON THE PUBLICATION OF THIS ANNOUNCEMENT, THIS INSIDE INFORMATION IS NOW CONSIDERED TO BE IN THE PUBLIC DOMAIN AND SUCH PERSONS SHALL THEREFORE CEASE TO BE IN POSSESSION OF INSIDE INFORMATION.

Article content

By signing up you consent to receive the above newsletter from Postmedia Network Inc.

Article content

CASCAIS, Portugal, Jan. 28, 2026 (GLOBE NEWSWIRE) — Pulsar Helium Inc. (AIM: PLSR, TSXV: PLSR, OTCQB: PSRHF) (“Pulsar” or the “Company”), a primary helium company, is pleased to announce that drilling of Jetstream #5 at the Company’s flagship Topaz Project in Minnesota, USA has been completed, drilled to a total depth (TD) of 3,839 feet (1,170 meters). As reported earlier (news releases January 9, 2026 & December 8, 2025) multiple pressurized gas influxes were encountered at depths of 837 feet (255 meters), 1,481 feet (451 meters) and 2,857 feet (871 meters). The bottom-hole pressure at 2,857 feet is estimated at ~1,292 pounds per square inch (psi), the highest recorded to date at Topaz. The drill rig has now mobilized to Jetstream #6 and commenced drilling on January 27, 2026.

Article content

Summary of Jetstream #5

Article content

The Jetstream #5 appraisal well has been successfully completed to a total depth of 3,839 feet, further advancing the Company’s multi-well appraisal program. During drilling, Jetstream #5 intersected multiple pressurized gas zones, with initial gas encountered at approximately 837 feet, followed by a second gas-bearing interval at approximately 1,481 feet, where a preliminary bottom-hole pressure of approximately 662 psi was calculated. As drilling progressed, an additional deeper gas influx was intersected at approximately 2,857 feet, where the calculated bottom-hole pressure increased significantly to approximately 1,292 psi, representing the highest pressure recorded to date at the Topaz Project. Gas influx was consistently observed during drilling operations, particularly during pauses in circulation, indicating sustained gas presence and a strongly pressurized reservoir system. While removing the drill string from the well at total depth, difficulties were encountered, and 1239 ft of drill string was left in the well. The Company is evaluating all options and plans to return to Jetstream #5 in April of this year to retrieve or bypass the segment of stuck drill string and allow the full logging and flow testing of the entire 3,839 ft of formation.

Article content

Article content

New Appraisal Well Jetstream #6

Article content

Drilling of the Jetstream #6 appraisal well commenced January 27th, with a designed TD of 3,000 feet (914 meters), with the possibility of deepening to 5,000 feet (1,524 meters). The appraisal well is located 1.3 miles (2.1 kilometers) to the southwest of Jetstream #1, another considerable step out with the intention of increasing the size of the Topaz resource.

Article content

Flow Testing and Pressure Build-Up Program

Article content

Pulsar is preparing to move forward with a coordinated testing program on the Jetstream #3 and #4 anticipated to commence in late February 2026. The program is expected to consist of a period of flow testing, followed by a period of pressure build-up. The test is planned to run for approximately six weeks per well. Pulsar will also be conducting as gas sample program during the flow period at the direction of Peter Barry. Interim results will be released to the market as data is received and verified by the Company.

Article content

About the Topaz Project

Article content

The Topaz Project is located in northern Minnesota, USA, where Pulsar is the first mover in helium exploration and holds exclusive leases over the project area. Topaz is a primary helium discovery that contains helium-4, helium-3 and CO2, not associated with primarily hydrocarbon production. Multiple wells drilled by Pulsar have confirmed a laterally extensive helium-rich gas reservoir beneath the project lands. These results appear to indicate a high-quality helium resource. The ongoing Jetstream multi-well appraisal program at Topaz is designed to map out the reservoir’s extent, pressure regime, and gas composition, which will inform resource estimation and development planning.

Read Entire Article