Article content
VANCOUVER, British Columbia, Sept. 18, 2026 (GLOBE NEWSWIRE) — Liberty Gold Corp. (TSX: LGD; OTCQX: LGDTF) (“Liberty Gold” or the “Company”) is pleased to announce that further to its news release dated September 8, 2026, the Company has filed a National Instrument 43-101 Standards of Disclosure for Mineral Projects (“NI 43-101”) technical report entitled “Technical Report and Feasibility Study for the Black Pine Project, Idaho, USA”, with an effective date of August 1, 2026, and dated September 18, 2026, on the Company’s profile on SEDAR+ at www.sedarplus.ca.
THIS CONTENT IS RESERVED FOR SUBSCRIBERS ONLY
Subscribe now to read the latest news in your city and across Canada.
- Exclusive articles from Barbara Shecter, Joe O'Connor, Gabriel Friedman, and others.
- Daily content from Financial Times, the world's leading global business publication.
- Unlimited online access to read articles from Financial Post, National Post and 15 news sites across Canada with one account.
- National Post ePaper, an electronic replica of the print edition to view on any device, share and comment on.
- Daily puzzles, including the New York Times Crossword.
SUBSCRIBE TO UNLOCK MORE ARTICLES
Subscribe now to read the latest news in your city and across Canada.
- Exclusive articles from Barbara Shecter, Joe O'Connor, Gabriel Friedman and others.
- Daily content from Financial Times, the world's leading global business publication.
- Unlimited online access to read articles from Financial Post, National Post and 15 news sites across Canada with one account.
- National Post ePaper, an electronic replica of the print edition to view on any device, share and comment on.
- Daily puzzles, including the New York Times Crossword.
REGISTER / SIGN IN TO UNLOCK MORE ARTICLES
Create an account or sign in to continue with your reading experience.
- Access articles from across Canada with one account.
- Share your thoughts and join the conversation in the comments.
- Enjoy additional articles per month.
- Get email updates from your favourite authors.
THIS ARTICLE IS FREE TO READ REGISTER TO UNLOCK.
Create an account or sign in to continue with your reading experience.
- Access articles from across Canada with one account
- Share your thoughts and join the conversation in the comments
- Enjoy additional articles per month
- Get email updates from your favourite authors
Sign In or Create an Account
or
Article content
Article content
The Technical Report was prepared by the following team of industry experts:
Article content
Article content
By signing up you consent to receive the above newsletter from Postmedia Network Inc.
Article content
| Category | Name | Company |
| Mineral Reserve Estimate, Mining Engineering, Geotechnical Engineering | Todd Carstensen, RM-SME | AGP Mining Consultants Inc. |
| Heap Leach Operating Model | Brendan Fetter, P.E. | Forte Dynamics |
| Legacy Heap Leach Facility Resource Estimate | Don Hulse, RM-SME | Forte Dynamics |
| Metallurgy | Gary Simmons, MMSA | GL Simmons Consulting LLC. |
| Environmental, Permitting & Compliance | Kyle Brangers, CPG | GSI Environmental Inc. |
| Mineral Processing | Benjamin Bermudez, P.E. | M3 Engineering & Technology Corp. |
| Infrastructure, Financial Evaluations, & Study Lead Engineer, Hydrology and Hydrogeology | Matthew Sletten, P.E. | M3 Engineering & Technology Corp. |
| Heap Design & Closure | Nicholas Rocco, Ph.D., P.E. | NewFields Companies LLC. |
| Mineral Resource Estimate, Geology | Valerie Wilson, P.Geo. | SLR Consulting (Canada) Ltd. |
Article content
The Technical Report is available on the Company’s website at www.libertygold.ca.
Article content
ABOUT LIBERTY GOLD
Article content
Liberty Gold is a U.S.-focused gold company advancing Black Pine, its 100% owned oxide gold project in Idaho, located within the Great Basin, one of the world’s most productive and mining-friendly gold regions. Black Pine is a large-scale, past-producing, run-of-mine heap leachable gold deposit advancing through permitting toward a potential construction decision. The Company’s strategy is centered on advancing high-quality, long-life gold assets, with a clear focus on technical simplicity, strong environmental performance, project executability, collaborative permitting processes, and value creation. This reflects Liberty Gold’s commitment to the discipline of delivery. The Company is led by an experienced team with a track record of discovery, development, and delivering sustained long-term value.
Article content
Article content
For more information, visit libertygold.ca or contact:
Article content
Susie Bell, Vice President, Investor Relations and Corporate Communications
Phone: 604-632-4677 or Toll Free 1-877-632-4677
[email protected]
Article content
This news release contains “forward-looking information” and “forward-looking statements” within the meaning of applicable securities laws, including statements or information concerning future financial or operating performance of Liberty Gold and its business, operations, properties and condition; planned de-risking activities at Liberty Gold’s mineral properties; expectations regarding the sufficiency of existing water rights to support the Project; plans regarding refining of gold and silver doré bars produced at the ADR plant; federal and state permitting timelines; future updates to the mineral resource, including potential resource growth and conversion of mineral resources to mineral reserves; completion and results of the DtM program, including the expected timing thereof, and expectations regarding the potential benefits of such program; the potential quantity, recoverability and/or grade of minerals; the potential size of a mineralized zone or potential expansion of mineralization; proposed exploration and development of Liberty Gold’s exploration property interests; expectations regarding dewatering requirements; the results of mineral resource estimates or mineral reserve estimates; the Company’s anticipated expenditures; the results and conclusions of the Feasibility Study, including projected mine life, production, recoveries, total cash costs, capital costs, AISC, cash flow, NPV, IRR and payback periods; gold price sensitivities; anticipated employment and community benefits and Black Pine’s ability to generate long-term value for shareholders and other stakeholders; execution-readiness; and potential completion of a construction decision and development of the Project.

1 hour ago
2
English (US)