K92 Mining Announces Strong Q2 Production Results – 46,093 oz AuEq Produced, with Strong Mine Ramp-Up Progress – Record Quarterly Lateral Development, and Ore Tonnes Mined and Processed

2 hours ago 3

Article content

See Figure 1: Quarterly Production, Co-Product Cash Cost and Co-Product AISC Chart
See Figure 2: Quarterly Ore Processed, Development, and Mined Material Chart
See Figure 3: Gold and Copper Recoveries Chart

Article content

Table 1 –2025 & 2026 Production Data

Article content

  Q2 2025Q3 2025Q4 20252025Q1 2026Q2 2026
Tonnes ProcessedT130,337137,172186,198557,156142,017225,965
Feed Grade Aug/t8.310.77.49.710.26.2
Feed Grade Cu%0.55%0.47%0.53%0.51%0.56%0.39%
Recovery (%) Au%93.3%95.0%94.3%94.7%95.1%93.8%
Recovery (%) Cu%94.9%94.6%93.9%94.5%94.0%93.2%
Metal in Conc & Doré Prod Auoz32,37542,24444,129164,48444,02242,931
Metal in Conc Prod CuT6976008802,695770808
Metal in Conc Prod Agoz42,96634,83147,427159,30938,84550,109
Gold Equivalent Productionoz34,81644,32347,178174,13446,74346,093

Article content

Notes – Gold equivalent for Q2 2026 is calculated based on:
Gold $4,561 per ounce; silver $73.55 per ounce; and copper $6.03 per pound.
  
 Gold equivalent for Q1 2026 is calculated based on: 
gold $4,717 per ounce; silver $78.37 per ounce; and copper $5.77 per pound.
  
 Gold equivalent for Q4 2025 is calculated based on: 
gold $4,131 per ounce; silver $56.44 per ounce; and copper $5.11 per pound.
  
 Gold equivalent for Q3 2025 is calculated based on:
gold $3,507 per ounce; silver $38.71 per ounce; and copper $4.49 per pound.
  
 Gold equivalent for Q2 2025 is calculated based on:
gold $3,299 per ounce; silver $33.41 per ounce; and copper $4.31 per pound.
  

Article content

Article content

Qualified Person

Article content

K92 Mine Chief Geologist, Andrew Kohler, PGeo, a qualified person under the meaning of Canadian National Instrument 43-101 – Standards of Disclosure for Mineral Projects, has reviewed and is responsible for the technical content of this news release. Data verification by Mr. Kohler includes significant time onsite reviewing drill core, face sampling, underground workings, and discussing work programs and results with geology and mining personnel.

Article content

Technical Report

Article content

The Updated Definitive Feasibility Study and mineral resource estimate for the Kainantu Gold Mine Project in Papua New Guinea are presented in a technical report, titled, “Independent Technical Report, Kainantu Gold Mine, Updated Definitive Feasibility Study, Kainantu Project, Papua New Guinea” dated March 21, 2025, with an effective date of January 1, 2024.

Article content

About K92

Article content

K92 Mining Inc. is engaged in the production of gold, copper and silver at the Kainantu Gold Mine in the Eastern Highlands province of Papua New Guinea, as well as exploration and development of mineral deposits in the immediate vicinity of the mine. The Company declared commercial production from Kainantu in February 2018, is in a strong financial position, and is working to become a Tier 1 mid-tier producer through ongoing plant expansions. A maiden resource estimate on the Blue Lake copper-gold porphyry project was completed in August 2022. K92 is operated by a team of mining company professionals with extensive international mine-building and operational experience.

Article content

Article content

On Behalf of the Company,

Article content

John Lewins, Chief Executive Officer and Director

Article content

For further information, please contact David Medilek, P.Eng., CFA, President and Chief Operating Officer at +1-604-416-4445

Article content

CAUTIONARY STATEMENT REGARDING FORWARD-LOOKING INFORMATION: This news release includes certain “forward-looking statements” under applicable Canadian securities legislation. Such forward-looking statements include, without limitation: (i) the results of the Kainantu Mine Definitive Feasibility Study, including the Stage 3 Expansion, a new standalone 1.2 million tonnes-per-annum process plant and supporting infrastructure; (ii) statements regarding the expansion of the mine and development of any of the deposits; (iii) the Kainantu Stage 4 Expansion, operating two standalone process plants, larger surface infrastructure and mining throughputs; and (iv) the potential extended life of the Kainantu Mine.

Article content

All statements in this news release that address events or developments that we expect to occur in the future are forward-looking statements. Forward-looking statements are statements that are not historical facts and are generally, although not always, identified by words such as “expect”, “plan”, “anticipate”, “project”, “target”, “potential”, “schedule”, “forecast”, “budget”, “estimate”, “intend” or “believe” and similar expressions or their negative connotations, or that events or conditions “will”, “would”, “may”, “could”, “should” or “might” occur. All such forward-looking statements are based on the opinions and estimates of management as of the date such statements are made. Forward-looking statements are necessarily based on estimates and assumptions that are inherently subject to known and unknown risks, uncertainties and other factors, many of which are beyond our ability to control, that may cause our actual results, level of activity, performance or achievements to be materially different from those expressed or implied by such forward-looking information. Such factors include, without limitation, Public Health Crises, including the epidemic or pandemic viruses; changes in the price of gold, silver, copper and other metals in the world markets; fluctuations in the price and availability of infrastructure and energy and other commodities; fluctuations in foreign currency exchange rates; volatility in price of our common shares; inherent risks associated with the mining industry, including problems related to weather and climate in remote areas in which certain of the Company’s operations are located; failure to achieve production, cost and other estimates; risks and uncertainties associated with exploration and development; uncertainties relating to estimates of mineral resources including uncertainty that mineral resources may never be converted into mineral reserves; the Company’s ability to carry on current and future operations, including development and exploration activities at the Arakompa, Kora, Judd and other projects; the timing, extent, duration and economic viability of such operations, including any mineral resources or reserves identified thereby; the accuracy and reliability of estimates, projections, forecasts, studies and assessments; the Company’s ability to meet or achieve estimates, projections and forecasts; the availability and cost of inputs; the availability and costs of achieving the Stage 3 Expansion or the Stage 4 Expansion; the ability of the Company to achieve the inputs the price and market for outputs, including gold, silver and copper; failures of information systems or information security threats; political, economic and other risks associated with the Company’s foreign operations; geopolitical events and other uncertainties, such as the conflicts in Ukraine, Russia, and the Middle East; compliance with various laws and regulatory requirements to which the Company is subject to, including taxation; the ability to obtain timely financing on reasonable terms when required; the current and future social, economic and political conditions, including relationship with the communities in Papua New Guinea and other jurisdictions it operates; other assumptions and factors generally associated with the mining industry; and the risks, uncertainties and other factors referred to in the Company’s Annual Information Form under the heading “Risk Factors”.

Read Entire Article