
Article content
ROUYN-NORANDA, Quebec, Jan. 29, 2026 (GLOBE NEWSWIRE) — Chibougamau Independent Mines Inc. (CBG-TSXV in Canada, CLL1-Frankfurt, Stuttgart, Berlin and Lang & Schwarz Stock Exchanges in Germany, CMAUF-OTC in the US), herein called Chibougamau, is pleased to update shareholders as regards recent drilling reported by TomaGold Corporation (LOT-TSXV, TOGOF-OTCPK) on the Berrigan property located west of the town of Chibougamau, under option from Chibougamau Independent Mines Inc. Updated option terms were published in a Chibougamau Independent press release dated September 30, 2025 accessible by clicking here.
THIS CONTENT IS RESERVED FOR SUBSCRIBERS ONLY
Subscribe now to read the latest news in your city and across Canada.
- Exclusive articles from Barbara Shecter, Joe O'Connor, Gabriel Friedman, and others.
- Daily content from Financial Times, the world's leading global business publication.
- Unlimited online access to read articles from Financial Post, National Post and 15 news sites across Canada with one account.
- National Post ePaper, an electronic replica of the print edition to view on any device, share and comment on.
- Daily puzzles, including the New York Times Crossword.
SUBSCRIBE TO UNLOCK MORE ARTICLES
Subscribe now to read the latest news in your city and across Canada.
- Exclusive articles from Barbara Shecter, Joe O'Connor, Gabriel Friedman and others.
- Daily content from Financial Times, the world's leading global business publication.
- Unlimited online access to read articles from Financial Post, National Post and 15 news sites across Canada with one account.
- National Post ePaper, an electronic replica of the print edition to view on any device, share and comment on.
- Daily puzzles, including the New York Times Crossword.
REGISTER / SIGN IN TO UNLOCK MORE ARTICLES
Create an account or sign in to continue with your reading experience.
- Access articles from across Canada with one account.
- Share your thoughts and join the conversation in the comments.
- Enjoy additional articles per month.
- Get email updates from your favourite authors.
THIS ARTICLE IS FREE TO READ REGISTER TO UNLOCK.
Create an account or sign in to continue with your reading experience.
- Access articles from across Canada with one account
- Share your thoughts and join the conversation in the comments
- Enjoy additional articles per month
- Get email updates from your favourite authors
Sign In or Create an Account
or
Article content
Article content
Tomagold has published assay results for two drill holes TOM-25-015 and TOM-25-014 as follows:
Article content
Article content
By signing up you consent to receive the above newsletter from Postmedia Network Inc.
Article content
- Drill hole TOM-25-015 (from 451.20 m): 5.75% ZnEq (1.34 g/t AuEq) over 98.5 m
- Including: 26.67% ZnEq (6.26 g/t AuEq) over 4.90 m
- Including: 7.26% ZnEq (1.69 g/t AuEq) over 49.35 m
- Including: 10.26% ZnEq (2.39 g/t AuEq) over 14.60 m, 9.94% ZnEq (2.31 g/t AuEq) over 3.25 m, and 14.82% ZnEq (3.45 g/t AuEq) over 6.20 m
- Drill hole TOM-25-015 confirms the discovery of a new major semi-massive sulfide zone, named Berrigan Deep, which remains open at depth
- Drill hole TOM-25-014 (from 185 m): 28.69% ZnEq (6.73 g/t AuEq) over 2.10 m
Article content
For more details, shareholders may access the Tomagold press release by clicking here.
Article content
Tomagold states that “Drill hole TOM-25-015, grading 5.75% ZnEq (1.34 g/t AuEq) over 98.5 m, is truly transforming the Berrigan Mine project and highlights a new semi-massive sulfide zone that extends at depth beneath the known zones. This very encouraging result suggests the presence of a large mineralized system that remains open at depth.”
Article content
The drill holes contain significant secondary silver and gold mineralization. The table below provides the breakdown of individual assays.
Article content
Article content
Results from drill holes TOM-025-014 and TOM-025-015: Berrigan Mine project
Article content
| Hole ID | From (m) | To (m) | Length (m) | ZnEq (%) | AuEq (g/t) | Au (g/t) | Ag (g/t) | Cu (ppm) | Zn (ppm) |
| TOM-25-014 | 185.00 | 187.10 | 2.10 | 28.69 | 6.73 | 4.94 | 56.44 | 545 | 45509 |
| 238.70 | 239.85 | 1.15 | 23.29 | 5.43 | 2.63 | 22.20 | 1590 | 104000 | |
| 251.20 | 252.60 | 1.40 | 41.79 | 9.80 | 7.44 | 37.30 | 552 | 80400 | |
| 405.30 | 406.70 | 1.40 | 14.99 | 3.48 | 1.13 | 13.15 | 655 | 92514 | |
| 423.30 | 426.30 | 3.00 | 2.34 | 0.54 | 0.07 | 5.45 | 493 | 15700 | |
| 451.50 | 457.50 | 6.00 | 1.34 | 0.31 | 0.08 | 3.45 | 77 | 7882 | |
| TOM-25-015 | 132.55 | 141.00 | 8.45 | 4.22 | 0.99 | 0.51 | 5.51 | 338 | 16610 |
| 155.70 | 157.70 | 2.00 | 31.75 | 7.42 | 4.66 | 26.90 | 684 | 102850 | |
| 182.10 | 202.20 | 20.10 | 2.55 | 0.60 | 0.36 | 3.20 | 265 | 7687 | |
| 451.20 | 549.70 | 98.50 | 5.75 | 1.34 | 0.82 | 3.21 | 386 | 19751 | |
| including | 452.20 | 457.10 | 4.90 | 26.67 | 6.26 | 4.69 | 18.80 | 2897 | 47876 |
| and including | 500.35 | 549.70 | 49.35 | 7.26 | 1.69 | 0.90 | 3.48 | 310 | 31250 |
| Including | 521.00 | 535.60 | 14.60 | 10.26 | 2.39 | 1.34 | 5.91 | 420 | 41158 |
| Including | 537.85 | 541.10 | 3.25 | 9.94 | 2.31 | 0.88 | 3.85 | 529 | 58200 |
| Including | 542.00 | 548.20 | 6.20 | 14.82 | 3.45 | 1.63 | 5.26 | 511 | 74276 |
Article content
Notes:
Article content
- The reported widths represent core lengths. True width is estimated to be approximately 80-85% of the core length, depending on the deviation angles.
- ZnEq and AuEq are calculated using the Company’s standard parameters.
- AuEq calculation was based on US$4150/oz Au, $51.36/oz Ag, US$5.044/lb. Cu and $1.398/lb Zn. AuEq = Au g/t + (Ag g/t × 0.01237) + (Cu ppm × 0.000083) + (Zn ppm × 0.000023). The use of AuEq is to calculate cut-off grades for exploration purposes, and no adjustments were made for metal recovery. The Company is currently in the initial exploration phase, following historical drilling. At this stage, the Company does not have any metallurgical data and no comparative studies have been conducted, given the geological complexity of the ultramafic host rock. Furthermore, the Company is not aware of any deposits that may have similar geological characteristics.
- ZnEq calculation was based on US$4047/oz Au, $50.22/oz Ag, US$4.796/lb. Cu and $1.390/lb Zn. ZnEq = Zn ppm + (Ag g/t × 527) + (Au g/t x 42466) + (Cu ppm × 3.45) / 10,000. The use of ZnEq is to calculate cut-off grades for exploration purposes, and no adjustments were made for metal recovery. The Company is currently in the initial exploration phase, following historical drilling. At this stage, the Company does not have any metallurgical data and no comparative studies have been conducted, given the geological complexity of the ultramafic host rock. Furthermore, the Company is not aware of any deposits that may have similar geological characteristics.

6 hours ago
3
English (US)