Atico Produces 2.23 Million Pounds of Cu and 1,553 Ounces of Au in First Quarter 2025

3 hours ago 1

Article content

VANCOUVER, British Columbia, May 06, 2025 (GLOBE NEWSWIRE) — Atico Mining Corporation (the “Company” or “Atico”) (TSX.V: ATY | OTCQX: ATCMF) announces its operating results for the three months ended March 31, 2025 from its El Roble mine. Production for the quarter totaled 2.23 million pounds of copper and 1,553 ounces of gold in concentrates, a decrease of 33% for copper and 28% for gold, respectively, over the same period in 2024.

Financial Post

THIS CONTENT IS RESERVED FOR SUBSCRIBERS ONLY

Subscribe now to read the latest news in your city and across Canada.

  • Exclusive articles from Barbara Shecter, Joe O'Connor, Gabriel Friedman, and others.
  • Daily content from Financial Times, the world's leading global business publication.
  • Unlimited online access to read articles from Financial Post, National Post and 15 news sites across Canada with one account.
  • National Post ePaper, an electronic replica of the print edition to view on any device, share and comment on.
  • Daily puzzles, including the New York Times Crossword.

SUBSCRIBE TO UNLOCK MORE ARTICLES

Subscribe now to read the latest news in your city and across Canada.

  • Exclusive articles from Barbara Shecter, Joe O'Connor, Gabriel Friedman and others.
  • Daily content from Financial Times, the world's leading global business publication.
  • Unlimited online access to read articles from Financial Post, National Post and 15 news sites across Canada with one account.
  • National Post ePaper, an electronic replica of the print edition to view on any device, share and comment on.
  • Daily puzzles, including the New York Times Crossword.

REGISTER / SIGN IN TO UNLOCK MORE ARTICLES

Create an account or sign in to continue with your reading experience.

  • Access articles from across Canada with one account.
  • Share your thoughts and join the conversation in the comments.
  • Enjoy additional articles per month.
  • Get email updates from your favourite authors.

THIS ARTICLE IS FREE TO READ REGISTER TO UNLOCK.

Create an account or sign in to continue with your reading experience.

  • Access articles from across Canada with one account
  • Share your thoughts and join the conversation in the comments
  • Enjoy additional articles per month
  • Get email updates from your favourite authors

Sign In or Create an Account

or

Article content

Article content

“The El Roble mine performed below schedule this quarter as the transition to the new areas was delayed by unexpected challenging rock quality conditions. Tonnage and particularly head grade were impacted as access to higher grade stopes was slowed down.” said Fernando E. Ganoza, CEO. “We expect to see progressive improvements in the second and third quarter this year to recover the planned development and preparation rate, which will allow us to make up for most of the lost production.”

Article content

Article content

First Quarter Operational Highlights

Article content

By signing up you consent to receive the above newsletter from Postmedia Network Inc.

Article content

  • Production of 2.23 million pounds of copper contained in concentrates; a decrease of 33% over Q1 2024.
  • Production of 1,553 ounces of gold contained in concentrates; a decrease of 28% over Q1 2024.
  • Average processed tonnes per day of 773, a decrease of 16% over Q1 2024.
  • Copper head grade of 1.97%, a decrease of 22% over Q1 2024.
  • Gold head grade of 1.40 grams per tonne; a decrease of 15% over Q1 2024.
  • Copper and gold recovery of 93.6% and 62.7%; an increase of 2% for copper and no significant change for gold, over Q1 2024.

Article content

First Quarter Operational Details

Article content

 Q1 2025
Total
Q1 2024
Total
%
Change
Production (Contained in Concentrates)   
Copper (000s pounds)2,2303,338-33%
Gold (ounces)1,5532,156-28%
Mine   
Tonnes of ore mined56,46764,873-13%
Mill   
Tonnes processed54,97865,787-16%
Tonnes processed per day773811-5%
Copper grade (%)1.972.51-22%
Gold grade (g/t)1.401.64-15%
Recoveries   
Copper (%)93.691.82%
Gold (%)62.762.1Nil
Concentrates   
Copper and Gold Concentrates (dmt)5,7638,274-30%
    
Payable copper produced (000s lbs)2,0913,137-33%
    

Article content

Article content

Note: Metal production figures are subject to adjustments based on final settlement. The reported results are preliminary in nature and are awaiting independent lab verification.

Article content

El Roble Mine

Article content

The El Roble mine is a high grade, underground copper and gold mine with nominal processing plant capacity of 1,000 tonnes per day, located in the Department of Choco in Colombia. Its commercial product is a copper-gold concentrate.

Article content

Since obtaining control of the mine on November 22, 2013, Atico has upgraded the operation from a historical nominal capacity of 400 tonnes per day.

Article content

El Roble’s reserves estimate, with an effective date of March 12, 2024, includes Proven and Probable mineral reserves of 828 thousand tonnes averaging 2.49% Cu, 2.20 g/t Au and a life of mine until Q1-2027. A full NI 43-101 technical report is available on SEDAR+.  For more information on the reserves estimate refer to SEDAR+ and on the Company’s website.

Article content

Mineralization is open at depth and along strike and the Company plans to further test the limits of the deposit. On the larger land package, the Company has identified a prospective stratigraphic contact between volcanic rocks and black and grey pelagic sediments and cherts that has been traced by Atico geologists for ten kilometers. This contact has been determined to be an important control on VMS mineralization on which Atico has identified numerous target areas prospective for VMS type mineralization occurrence, which is the focus of the current surface drill program at El Roble. 

Read Entire Article